- Runtime1,250+ operating hoursbmw-results-2026, figure-results-2025
- Task output90,000+ sheet-metal parts; contribution to 30,000+ BMW X3 vehiclesbmw-results-2026, figure-results-2025
- Operating pattern10-hour shifts, Monday through Fridaybmw-results-2026, figure-results-2025
- Observation-period boundaryBMW reports ten months; Figure describes an 11-month deploymentbmw-results-2026, figure-results-2025, bmw-figure03-2026
- Autonomy boundaryProduction task described as autonomous; autonomous-time share not publishedbmw-trial-2024, figure-results-2025
HU-R001 / v1 / deployment audit
Figure 02 × BMW
The strongest quantified public humanoid production record in this initial review, with cumulative runtime and task output confirmed by both the robot maker and the site operator.
Evidence verdict
Established. Claimed. Unknown.
- Hardware reliability“Minimal hardware failures”; forearm identified as top hardware failure pointfigure-results-2025
- Human interventionEvery intervention was loggedfigure-results-2025
- Measured availability
- Human intervention rate
- MTBF and MTTR
- Exact fleet size in the reviewed results
Audit conclusion
BMW corroborates 1,250 operating hours and 90,000 parts, but those totals have no scheduled-time, downtime or fleet denominator. BMW describes ten months of production support while Figure calls the broader program an 11-month deployment; the sources do not reconcile those scopes. Failure counts, intervention rate, MTBF, MTTR and measured availability remain unpublished.
01 / Disclosure
The public reliability record
02 / Claims audit
Claim by claim
1,250+ operating hours
The cumulative operating-hour total is corroborated by BMW Group and Figure AI. Neither source publishes scheduled robot time, downtime, the unit-level distribution or the exact fleet denominator.
Sources: bmw-results-2026, figure-results-202590,000+ sheet-metal parts; contribution to 30,000+ BMW X3 vehicles
Output is corroborated, but attempts, rejected cycles, retries and human-assisted cycles are not separated.
Sources: bmw-results-2026, figure-results-202510-hour shifts, Monday through Friday
A nominal shift pattern is disclosed, but neither source states that every robot was scheduled for every shift or publishes downtime; availability cannot be derived.
Sources: bmw-results-2026, figure-results-2025BMW reports ten months; Figure describes an 11-month deployment
BMW ties the production contribution to ten months. Figure describes an 11-month deployment, says full deployment launched within ten months and separately cites six months of daily runtime. The public sources do not define a single common start date or explain the scope difference.
Sources: bmw-results-2026, figure-results-2025, bmw-figure03-2026“Minimal hardware failures”; forearm identified as top hardware failure point
Qualitative manufacturer statement without counts, severity, repair time or denominator.
Sources: figure-results-2025Every intervention was logged
The existence of logs is disclosed; the number and definition of interventions are not.
Sources: figure-results-2025Production task described as autonomous; autonomous-time share not published
BMW's initial trial account describes autonomous execution and Figure defines human pauses or resets as an intervention KPI. Neither party publishes the proportion of runtime that was autonomous, supervised, paused or under recovery.
Sources: bmw-trial-2024, figure-results-202503 / Timeline
What changed, and when
-
BMW reports a multi-week production trial
Figure 02 inserts sheet-metal parts into fixtures in the Spartanburg body shop.
bmw-trial-2024 -
Production deployment
BMW later reports ten months of production contribution; Figure calls the wider program an 11-month deployment and separately cites six months of daily runtime.
bmw-results-2026, figure-results-2025 -
Figure publishes final deployment results
Figure 02 returns to headquarters as part of the fleet-wide retirement of the model.
figure-results-2025 -
BMW announces successor project
Figure 03 begins a new logistics sequencing project at the same plant.
bmw-figure03-2026
04 / Source ledger
Review the evidence
-
bmw-trial-2024Operator statement
Successful test of humanoid robots at BMW Group Plant Spartanburg ↗
BMW Group · Published 2024-08-06 · Accessed 2026-09-04
-
figure-results-2025Manufacturer statement
F.02 Contributed to the Production of 30,000 Cars at BMW ↗
Figure AI · Published 2025-11-19 · Accessed 2026-09-04
-
bmw-results-2026Operator statement
BMW Group first to deploy humanoid robots in production in Germany ↗
BMW Group · Published 2026-02-27 · Accessed 2026-09-04
-
bmw-figure03-2026Operator statement
BMW Group advances the use of Physical AI in production with Figure 03 project in Spartanburg ↗
BMW Group · Published 2026-06-25 · Accessed 2026-09-04